The Knauf P 112 complete system is a complete set of specially selected materials needed to create a false ceiling on a two-level metal frame. The finished ceiling structure is not a structural (bearing) element of the building.
The main building elements of the ceiling:
The complete composition of the complete system and the required amount of materials per 1 sq. ceiling meter, see “Technical data”.
Distinctive features of this system: the main profiles of the suspended ceiling frame, fixed using suspensions to the base ceiling, and the supporting profiles to which the Knauf plasterboard is attached, are located at different levels.
In addition to the main elements, the complete system includes the technical solutions necessary for solving a specific construction task, recommendations for the performance of work, as well as tools and fixtures.
All elements of the P 112 complete system are manufactured using modern technologies, undergo strict quality control, are functionally oriented and, as part of the complete system, ensure the reliability of the entire structure during long-term operation.
Suspended ceiling made of Knauf sheets on a two-level metal frame.
The composition of the complete system – quantity per m2 :
* Quantity corresponds to the perimeter of the room.
** Position not shown in figure, used with direct suspension.
( ) Component options are given in parentheses.
The data on the amount of materials are indicative, do not take into account cutting losses and require clarification on the project.
It is used in premises for various purposes, both during reconstruction and in new construction in order to:
The installation process includes the following stages of work:
Installation of suspended ceilings should be carried out during the period of finishing work (in winter with heating connected), before the installation of clean floors, when all the “wet” processes are completed and wiring of electrical and plumbing systems has been completed, in dry and normal humidity conditions in accordance with SP 50.13330.2012 Thermal protection of buildings. Updated edition of SNiP 23-02-2003. In this case, the temperature in the room should not be lower than 10°C.
In conditions of high humidity (bathrooms, kitchens), it is recommended to use moisture-resistant KNAUF plasterboard sheets (GKLV).
The location of electrical wiring in the space of the ceiling frame should exclude the possibility of damage to them by the sharp edges of the frame elements or screws during the fastening of drywall sheets.
Painting suspended ceilings P 112 is recommended to be done with water-dispersion paints. It is not allowed to apply lime paints and paints on liquid glass.